Out for Bids |
City of Morganton
|
Water System Improvements
|
Bid Date: November 25, 2008
| |
|
Description of Work:
The work to be done consists of furnishing all materials, equipment and labor for the construction of:
Division One Part A: Approximately 10,182 linear feet of 8-inch water line, 30,710 linear feet of 6-inch water line, 1,195 linear feet of 4-inch water line and 25 linear feet of 2-inch water, complete with appurtenances.
Division One Part B: Approximatey 896 linear feet of 10-inch water line, 13,269 linear feet of 8-inch water line, 28,071 linear feet of 6-inch water line, 295 linear feet of 4-inch water line and 275 linear feet of 2-inch water line, complete with appurtenances.
Division One Part C: Approximately 12,743 linear feet of 8-inch water line, 20,919 linear feet of 6-inch water line and 30 linear feet of 2-inch water line, complete with appurtenances.
Division Two: One 150,000 gallon elevated water tank including site work, valve pit, access road, piping, existing valve replacement and appurtenances.
Time allotted for construction is 365 consecutive calendar days for Division One or any part and 365 consecutive calendar days for Division Two.
|
City of Sandersville, GA.
|
Roadway and Drainage Improvements
|
Bid Date: November 18, 2008
| |
|
|
|
Description of Work:
The work to be done consists of furnishing all materials, equipment, and labor for the construction of: Roadway and drainage improvements including the installation of approximately 1,420 L.F of 12-inch through 72-inch storm drain pipe, 811 L.F. concrete curb and gutter, 2,048 L.F. ditch cleaning and regradiing, 2,491 S.Y. reinforced concrete ditch paving, 12 catch basins and one storm sewer manhole. All work complete with appurtenances including soil erosion control and traffic control.
Time allotted for this work is 180 consecutive calendar days.
|
City of Lincolnton, GA.
|
Sewerage System Improvements
|
Bid Date: December 2, 2008
| |
|
|
|
Description of Work:
The work to be done consists of furnishing all materials, equipment, and labor for the construction of: Division One: Sewer Lines and Appurtenances Install approximately 3,522 L.F. of 10-inch PVC gravity sewer with 12 manholes and approximately 1,571 L.F. of 6-inch PVDC force main with apprutenances.
Time allotted for this work is 180 consecutive calendar days.
Division Two: Upgrade Existing Pump Stations Upgrade two (2) existing pump stations including constructio of two (2) submersible duplex pump stations, connecting to the existing sewers and the demolition of the existing pump stations.
Time allotted for this work is 180 consecutive calendar days.
|
|
|
| | | | | | |
|
|
|