Additions to the Rocky Creek Water Pollution Control Plant Town of McCormick, South Carolina Increase treatment capacity to 3.35 mgd
The project consisted of construction of
- additions to the raw sewage pump station,
- two aeration basins,
- two final clarifiers,
- an ultraviolet disinfection unit,
- return sludge pump station,
- sludge dewatering building,
- control building and
- modifications to the existing plant, all complete with appurtenances.
Scope of services provided: Met with Town personnel to discuss scope of project; prepared Preliminary Engineering Report consisting of recommendations, cost estimates, implementation schedule and possible funding sources; assisted with funding application to Rural Development, South Carolina; prepared Design Development Report and Environmental Information Document; prepared materials and attended public hearings; prepared NPDES Permit application; prepared plans, bid documents and construction specifications; obtained SCDHEC and EPA approval of plans and specifications; received construction bids; prepared bid tabulation and letter of recommendation of contract award; prepared contract documents between owner and contractor; conducted preconstruction conference; issued notice to proceed; checked shop drawings; provided on-site resident inspection; reviewed and approved contractors request for payment; provided record drawings to the owner.
Total Construction Cost: $4,659,000. Project completed in August 2002.
 |